久久婷婷六月天婷婷,欧美日本日韩一区二区三区,黄色三级三级三级视频,国内精品丝袜福利视频

Welcome to Shenzhen Zhongyuan Plastic Co., Ltd!

News



Tel:(0755)27151698
Fax:(0755)27150611
Mailbox:szzyzcl@163.com / szzy@szzy99.com
Add:Building A1 and A2, No.1 Industrial Zone, yuliu property company, Gongming town, Bao'an District, Shenzhen
Industry information

當(dāng)前位置:

首頁 News Industry information

Insulation work of medical device shell

Release time:2023-03-30

Medical diagnosis, measurement and treatment equipment using AC power supply may cause leakage current due to improper grounding and electrical insulation, which may expose patients and even medical staff to the risk of electric shock, burns, internal organ damage and arrhythmia. So do a good jobMedical device shellInsulation work.

美容儀器殼9.jpg


1. The equipment shall be manufactured and sealed to prevent contact with live parts and parts that may be live in a single fault state. If the bulb can be replaced without tools, it must be ensured to prevent contact with the live parts of the lamp when loading and unloading the bulb.


2. The position or size of any hole on the top cover of the medical device shell shall ensure that the test rod with a diameter of 4 mm and a length of 100 mm will not touch live parts when it is freely and vertically suspended in the access hole throughout its length.


3. When the handle, knob, control lever, etc. are removed, the conductor part of the operating mechanism of the control device can be touched. When the open circuit test voltage is not greater than 50V AC and the test current is not less than 1a, the resistance measured to the protective grounding terminal should not be greater than 0.2 Ω; Or it should be isolated from live parts by adopting a method of 17g in GB 9706.1-2007.


4. If the components with line voltage above 25V AC or 60V DC in the shell of the medical device cannot be disconnected from the power supply through the external main switch or the plug device that can be pulled out at any time, additional covers shall be used for protection, so that contact can be prevented even after the shell is opened, or when the spaces are separated and arranged, the "live" mark shall be clearly marked.


5. In order to prevent contact with live parts, the shell must be removed only with tools, otherwise an automatic device should be used when opening or removing the shell, so that these parts are not used.


6. When the device has a preset controller, it can be adjusted by the user with tools during normal use. The hole opened for adjusting these control devices shall be designed so that the adjusting tool cannot contact the basic insulation or any live parts in the hole, or any parts isolated from the grid power supply part only through the basic insulation but without grounding protection.


Copyright: Shenzhen Zhongyuan Plastic Co., Ltd. | mold processing customized manufacturer. If you want to know the processing price of the factory, how much is it, and which is good, please contact us Yue ICP Bei No. 17060480
亚洲欧美中文字幕第二十| 综合伊人久久在一二三区| 操鸡巴奶子在线观看| 猛哥操女人B视频| 无码爆一二三区免费视频| 日本欧美人一区二区三区| 国产精品熟女视频播放| 91大神精品动漫| 国产成人亚洲精品在线看| 欧美亚洲综合久久夜夜嗨| 国产成人AV剧情| 加勒比在线不卡一区二区观看| 91kaobi视频在线| 美女被大屌操大骚逼| 九九在线视频热线视频精选| 亚洲国产区男人本色| 鸡巴插进女人的逼里| 中文字幕在线观一二三区| 日本高清一区二区三区不卡| 色男人天堂亚洲男人天堂| 中文字幕在线视频一区二区| 国产精品一区二区三区色噜噜| 久久久久久国产A免费观看| 国产亚洲精品高清视频免费| 亚洲综合青青草原在线| 免看一级a一片成人欧美| 美女呻吟翘臀后进爆白浆| 国产试看精品无码中| 午夜国产三级一区二区三| 国产无码久久久久久| 日韩 中文字幕在线最新| 欧美精品一区二区三区四区五区| 成人区久久精品一区二区| 美女骚逼黄色18禁| 视频一区二区三区日韩视频| 日本韩国国产精品一区| 大鸡吧干小逼逼视频大全| 国产精品不只是精品| 最新AV中文字幕在线看| 日韩 欧美 成人 免费| 国产精品人妇一区二区三区|